0. PREFACE
Before we jump into the main text, I need to make one thing clear. The connection between ONEOK and the TERAFAB project is speculation, done by myself. None of these companies confirmed a partnership. But if we want to build alpha, we need to look where no one else does.
Right now, everybody just speaks about the tech part. They talk about chips, compute and space. But this scale creates a massive energy challenge. This combination of energy supply and semi manufacturing is lucrative. It allows you to profit indirectly, even with a dividend focus. ONEOK is perfectly positioned to capture this value added. We simply follow the physical energy demand.
I also want to be open about the structure of this post. A large part of this article is free to read. I want to share the core ideas with everyone. However, to map out the different outcomes of future scenarios, I built a Monte Carlo simulation. This model is reserved for paid subscribers. If you find the free research helpful, an upgrade gives you access to the math and the value creation models.
Bonus Chapter: I also included the LPKF (Ticker $LPK $LPK.DE or US OTC $LPKFF) dominance (a <€200M German micro-cap) as a bonus chapter below, for free. The transition to glass substrates starts now. Standard materials fail in space and at high speeds. Glass solves this challenge. We will break down why the wider semi market depends on the LPKF process for glass cores and how this bottleneck could drive value creation for investors.
Source: Own Creation
1. Intro
The global tech ecosystem is moving fast these days, driven by the exponential scaling of AI compute requirements. No single week without major announcement. The intersection of gen AI, autonomous robotics and orbital data processing (announced SpaceX IPO) has kicked-off a structural crisis in both semi manufacturing capacity and industrial energy markets, all in line with Leopold Aschenbrenners Situational Awareness strategy, which I described in the WOLTERS article below (Chapter 1, no paywall) in detail:
On March 21, 2026, Elon Musk initiated a radical departure from traditional silicon supply chains by announcing “TERAFAB,” a joint venture comprising Tesla, SpaceX, and xAI. Hosted at the decommissioned Seaholm Power Plant in Austin, Texas, the announcement detailed a $20B to $25B greenfield semi manufacturing complex intended to be built close to Tesla’s Giga Texas campus. The facility’s stated objective is to produce one terawatt (TW) of AI compute capacity p.a., a figure that represents approx. fifty times the current output of the entire global semi industry, which currently stands at roughly 20 gigawatts (GW).
The core thesis underpinning the TERAFAB project is that Musk’s corporate ecosystem is known for deep vertical integration. Over the past few decades, the semi fab industry has seen a shift from IDMs to fabless chip designers and specialized foundries. High specialization ensures technical excellence, but makes demand planning a major challenge in times of limited production capacity. An integrated model, particularly in collaboration with an industry heavyweight as a foundry partner, can respond to in-house customer requests much more quickly and translate requirements into specific end-to-end processes much faster. That is the basic idea.
To achieve the one terawatt compute objective, the TERAFAB complex aims to scale to an unprecedented 1,000,000 wafer starts per month (WSPM) at full capacity, utilizing 2-nanometer (nm) process technology.
The strategic output of this facility is multidimensional: the AI5 and AI6 edge-inference processors (Dojo’s successor) designed for Tesla’s Full Self-Driving (FSD) architecture and the Optimus humanoid robot platform, and the D3 radiation-hardened processors engineered for SpaceX’s planned constellation of orbital AI DCs.
Musk has projected that 80% of the compute output will be allocated to space-based infrastructure, leveraging the vacuum of space for thermal dissipation and orbital solar irradiance for continuous power generation.
On April 7, 2026, the operational viability of the TERAFAB project was drastically altered when Intel INTC 0.00%↑ formally announced its participation as the primary foundry partner. Intel’s brings the deep tech know how, not just the processes but also decades of research in specialized niche areas. More on that later. By leveraging Intel’s advanced process nodes (such as Intel 18A and 14A), HVM expertise, and proprietary advanced packaging technologies like Foveros 3D stacking and the Embedded Multi-die Interconnect Bridge (EMIB), the joint venture seeks to consolidate chip design, extreme ultraviolet (EUV) lithography, memory production, and packaging under a single, contiguous roof.
TERAFAB specs and parameters for calculation:
Corporate Joint Venture: Tesla, SpaceX, xAI, Intel Corporation
Location: Giga: Texas, Austin, Texas, approx: 30°13′15″N 97°37′07″W
CapEx: $20B to $25B
Process Node Target: 2-nanometer (nm) generation
Initial Production Target: 100,000 Wafer Starts Per Month (WSPM)
Maximum Scaled Capacity: 1,000,000 Wafer Starts Per Month (WSPM)
Annual Compute Output Goal: 1 Terawatt (TW)
Primary Silicon Products: AI5/AI6 Edge Inference (20%), D3 Orbital Processors (80%)
The physical circumstances of semi manufacturing at this extreme scale dictates an electrical load profile that existing utility grids can’t support. A facility scaling to 1,000,000 WSPM, combined with the co-location of massive AI training and inferencing superclusters, will require an estimated 10 gigawatts (GW) of continuous, highly reliable baseload power. Given the known fragility of the Electric Reliability Council of Texas (ERCOT) grid and the immense regulatory backlash xAI recently faced for utilizing unpermitted mobile gas turbines in Memphis, Tennessee, the TERAFAB project needs a powerful natural gas power infrastructure.
Source: SELC
This article builds a thesis that ONEOK OKE 0.00%↑ could emerge as the apex beneficiary of this structural energy deficit. By leveraging its expansive Permian Basin natural gas gathering network, the recently upsized 3.7 billion cubic feet per day (Bcf/d) Eiger Express Pipeline, and a novel “Gas-as-a-Service” (GaaS) long-term contracting model, ONEOK is uniquely positioned to underwrite the TERAFAB energy requirement.
Foundry Landscape and Why Intel
In general, the global semi fab market is characterized by extreme tech barriers to entry and staggering CapEx intensity. For decades, the cutting edge semi industry has been dominated by a triopoly: TSMC, Samsung Electronics and Intel (not including the major mature notes fabs). The transition to the 2nm node requires requires moving to Gate-All-Around (GAA) nanosheet transistors. GAA architectures allow the transistor gate to completely surround the channel, vastly improving electrostatic control, reducing current leakage, and enabling higher transistor density without losing energy efficiency. See here for further GAA implications and challenges:
TSMC initiated risk production of its 2nm (N2) process in the fourth quarter of 2025, with HVM targeted for 2026. TSMC’s N2 process uses ultra-high-performance metal-insulator-metal (SHPMIM) capacitors and reduces power consumption by 25% to 30% at the same performance level compared to its N3E node. However, TSMC’s capacity is heavily monopolized by clients such as Apple and Nvidia, leaving limited allocation for Tesla’s projected demand of 100 to 200 billion AI and memory chips annually.
Samsung Foundry has aggressively pursued GAA technology, implementing it early in its 3nm node. The South Korean conglomerate has faced persistent yield hurdles with its GAA implementation, leading to reports that it may delay its subsequent 1.4nm roadmap until 2029.

Source: WRAL News
While Samsung remains a very important supplier to Tesla, having recently secured a significant contract for AI6 chip production, its inability to guarantee the exponential vol scaling required for the Optimus robot platform necessitated Musk’s vertical integration strategy.
Intel’s entrance into the TERAFAB consortium on April 7, 2026, shifts the foundry dynamic. Intel has historically struggled with process node delays but has recently executed an aggressive roadmap to regain process leadership. By partnering with Tesla, SpaceX and xAI, Intel Foundry secures a high-volume anchor tenant that justifies massive CapEx. Intel brings the necessary expertise in Advanced Technology Fabrication (ATF), particularly in the integration of High-NA (Numerical Aperture) EUV lithography and backside power delivery systems, which are essential for mitigating the power-hungry nature of sub-2nm data center chips.
Katie Prouty, the Rio Rancho site plant manager and a 31-year veteran of Intel, emphasizes during a walk-through that one of Intel’s selling points for advanced packaging is that customers can opt to use Intel for any part of the process, or “enter and exit the highway” at any point. A customer can, for example, purchase wafers from one entity, then come to Intel’s fabs for the next step; or contract with an outsourced semiconductor assembly and test company for traditional chip packaging, then use Intel for advanced packaging.
“That’s not something Intel did before. We never took in other customers’ wafers,” Prouty said. “That’s been a huge mindset shift.”
Competent, cutting-edge technology? Check. Chips packaged specifically for AI? Check. Flexibility for customers with certain needs? Check. So, where are all the customers?
Source: arsTECHNICA, Intel is going all-in on advanced chip packaging
There are very good chances, that Intel Foundry is on the right track to get back. If you want to dig deeper, klick here.
The TERAFAB partnership operates as a quasi-licensing consortium where Intel provides the process IP, manufacturing execution, and advanced packaging, while Musk’s entities provide the capital infrastructure and guaranteed demand.
Table of content:
Foundry, 2nm Node Status, Advanced Packaging, Stance on High-NA EUV
TSMC, N2 mass production late 2025 / 2026, CoWoS, InFO, Conservative; extending Low-NA 0.33 to 2028
Samsung, Scaling GAA; 1.4nm delayed to 2029, I-Cube, X-Cube, Phased adoption; early units installed late 2025
Intel, 18A in production; 14A risk production 2027, Foveros 3D, EMIB, Aggressive; first commercial acceptance of EXE:5200B
🔎 💡Intel Supply Chain Deep Dive Side Car
Let’s connect all the dots. Like mentioned earlier, most of my articles are connected to each other. No exception here. Let’s sum up the “Musk Empire/Tesla/xAI/SpaceX, TERAFAB, Intel, Glass, GaN, Schmid” connection. Musk didn’t choose Intel randomly. The SpaceX, TERAFAB, Intel partnership is in the making for month, if not for years.
Why GaN and Glass Substrates are the Secret to Orbital AI
It’s clear that Elon Musk’s decision to allocate 80% of TERAFAB compute output to space changes the entire semi landscape. Building SpaceX orbital AI DCs presents a major challenge. Standard silicon degrades rapidly under high radiation in space. The physical solution to this challenge relies on Gallium Nitride and glass substrates. Let’s break it dow: How Intel and TERAFAB plan to execute this process and where the value creation lies for equipment providers like Schmid Group.
Gallium Nitride: The Radiation Hardened Material
Gallium Nitride, or GaN, is a wide bandgap semi material. It’s naturally radiation hardened. It operates efficiently in extreme temperatures and high radiation environments without the rapid degradation seen in standard silicon. It’s also significantly more efficient for power switching and high frequency operations.
Intel Foundry recently unveiled the world’s thinnest GaN chiplet, measuring just 19 micrometers.
Source: Intel Community
They successfully manufactured a 300mm GaN on Silicon wafer. Intel integrated GaN transistors directly with traditional silicon based digital circuits on a single chip. This process allows complex computing functions to be built directly into power chiplets. You no longer need separate companion chiplets. This integration is a significant value creation for SpaceX because it enables highly compact and efficient space compute architectures. I’m confident this will be a major catalyst for the US space and semi sectors.
Glass Substrates in Advanced Packaging
To pack these ultra thin GaN chiplets into powerful orbital processors, traditional organic substrates fall short. Organic substrates warp under extreme heat and have poor dimensional stability. Glass substrates offer superior thermal stability and exceptional dielectric properties. They also allow for higher chiplet integration which is essential for the D3 processor architectures. Intel is the industry pioneer in glass substrates for advanced packaging. This makes Intel the logical foundry partner for the TERAFAB space challenge.
How Schmid Group Profits from this Process
The transition to glass substrates and advanced Panel Level Packaging represents a significant capital cycle for equipment suppliers. The Schmid Group, listed under the ticker SHMD 0.00%↑, is a niche specialist for advanced electronics and substrate equipment, based in Germany. They recently secured major orders for AI server PCB production and Panel Level Packaging.
The Schmid story is basically a triller and a story on its own. I already wrote three parts, start with the first part here:
Schmid Group provides the critical wet processing equipment and their proprietary Embedded Trace technology. This technology handles advanced substrates below two microns on glass. To scale glass substrate manufacturing for millions of orbital chips, the semi supply chain will need specialized equipment at scale. Schmid Group offers more than 70% of the processes and equipment needed for this next generation of substrate production. As the industry moves to glass to support GaN based AI chips, Schmid Group stands out as a pure play enabler, collecting significant value added from the substrate manufacturing build out.
The LPKF Alpha Case in Glass Substrates
While SCHMID Group provides wet processing equipment, another German company solves the biggest challenge in glass substrate manufacturing: laser drilling. This company is LPKF Laser & Electronics, $LPKFF
LPKF currently trades at a market cap of approximately $210M with a 1.5x price to sales ratio. For a company positioned as a critical bottleneck in the semi space, this valuation could present a massive value added opportunity.
The logical bridge to TERAFAB is straightforward. Reuters reported on April 7, 2026, that Intel joined the Musk project specifically to provide advanced packaging capabilities. If TERAFAB relies on Intel for next generation packaging, and Intel relies on the LPKF LIDE process for glass core substrates, LPKF indirectly becomes the technological bottleneck for the entire $25B TERAFAB vision.
LPKF joined the Onto Innovation Packaging Applications Center of Excellence in April 2025. This partnership aims to develop seamless process integration for panel level packaging based on glass cores. Combined with evidence from their 2021 equity deck showing early volume production orders from a leading global chipmaker, it’s clear LPKF is cementing itself as the industry standard.
LPKF’s place in the semi supply chain is pretty fascinating and it’s almost crazy to see, that the wider glass ecosystem depends on LPKF, at least in the pre-production phase. GenZinvest0r on X summed everything perfectly up:
It's pretty interesting that the whole glass substrate supercycle essentially hinges on LPKF, a <€200M market cap company from Germany.
Glass is hitting an inflection point and the supply-chain is gearing up. Intel spent $1B+ on it. Samsung is sampling Apple. Absolics built a $600M fab in Georgia. LG Innotek is building pilot lines. Corning, AGC, SCHOTT are all supplying the glass.
CapEx is ramping and glass looks imminent (it is) to become the base material for the next generation of leading edge semi packaging–however if you dive deeper down the rabbit hole, you’ll quickly notice that glass substrates are useless without Through-Glass-Vias, tiny microscopic holes that carry electrical signals through the glass. No TGVs, no glass substrate, no party. It's literally just a piece of overengineered glass without them.That leads us to LPKF. Let me give you the surface level overview of the thesis:
TGV is hard. Glass is brittle. Traditional drilling can leave micro-cracks, rough edges and stress on the glass. This can hurt reliability and lower yield which directly leads to reduced margins.LPKF does things a little different. They invented a two step process which uses a laser to modify the internal structure of the glass–then a wet chemical etching process which dissolves the modified regions. No micro-cracks, defect-free holes and sub-micron precision. This process is called LIDE (Laser-Induced Deep Etching) and is currently being adopted by ~80% of the glass substrate market for their qualifications.
Here is the overview:
- Intel: glass substrate packaging for 18A/14A, Clearwater Forest
- Samsung Electro-Mechanics: sampling Apple and Broadcom, 2027 mass production
- Absolics: first CHIPS Act recipient for glass, ramping production in Georgia
- 011070/LG Innotek: pilot line, partnered with UTI, targeting 2028
- GLW 0.00%↑: supplying substrate-grade glass compositions
- AGC, SCHOTT, Nippon Electric Glass: sameAll of these companies are betting their next-gen packaging roadmaps on glass. LPKF holds 80% market share in qualification with a long-term goal of maintaining 70% market share once HVM starts. Based on the list above, I'll let you take a guess who will, and won't depend on LPKF moving forward.
General interest around LPKF is growing. A researcher named vlmkapital recently shared critical breakthroughs linking LPKF to the biggest players in the semi industry. The noteworthy German “Glass Panel Technology Group”, led by Fraunhofer IZM, shows the leading deep tech players. A trained eye also recognises PLANOPTIK AG. But that was a story of a former article.
Source: VLMK on X
The core value added of LPKF comes from their Laser Induced Deep Etching process, known as LIDE.
Source: 50 years of LPKF, Advanced Packaging
Creating Through Glass Vias (TGV) without cracking the glass is a major challenge. LIDE uses ultrafast laser modification followed by wet etching to solve this. According to LPKF management, over 80% of customers preparing for glass and advanced packaging are qualifying with LPKF equipment. We will need to watch, if that translates to HVM, but a strong foundation is always a good inducator.
Let us break down the specific value creation vectors, relying on the mapping published at vlmkapital.com, all in context of the TERAFAB / INTEL partnership:
Intel plays the central role in TERAFAB. Intel needs a reliable glass substrate process to build orbital AI chips. vlmkapital found a direct link in Intel high aspect ratio glass core patents. The patents describe a process where laser exposure alters the glass microstructure to render it susceptible to an etching chemistry. This perfectly matches the LPKF LIDE process. Intel does not possess substantial internal capabilities for this specific process. This makes LPKF a bottleneck supplier for Intel advanced packaging ambitions. Since Intel started partnering with a large US semi company three years ago, the timelines align perfectly with Intel announcements for glass substrates. It’s highly probable that LPKF provides the equipment for Intel, according to the article.
Highly probable, because of that (german) SdK - Deep Dive YT Video with LPKF. Thanks for highlighting, again VLMkapital on X.
Source: SdK on Youtube
Almost ridiculous, in german, he says he can not name names, but is highlighting with his mouse cursor on the presentation the name “Intel”.
Source: VLMkapital on X.
Anyway, the actually interesting insight here is that Intel does not seem to be doing the relevant TGV work in-house, which strengthens LPKF's positioning even more inside the Intel supply chains.
If you want to go full deep dive on that very good interview in german (use subtitles), here’s the link. There a slides in the presentation, I haven’t seen anywhere before. And please do me a favour, like the video. SdK puts so much effort to boost the interests of retail investors in Germany 🙏
I want to map out some details from the SdK interview:
CEO Dr. Fiedler reveals a noteworthy detail. An anonymous competitor tried to invalidate the foundational LPKF patent for the LIDE process at the European Patent Court. The competitor failed completely. The patent survived the legal challenge. This proves their intellectual property is extremely robust. Anyone who wants to use this specific process for glass substrates must go through LPKF.
Investors often ask why HVM has not started yet. Fiedler clarifies that LPKF itself is not the cause. Their equipment is fully qualified and green lit by the major players. The delays are caused by downstream process steps. The wider semi supply chain is still struggling to yield the packaging steps. This delays the mass deployment of the LPKF machines.
LPKF is expanding its footprint deeper inside the semi fab. The management announced they are introducing a second process step. After drilling the vias, the highly expensive glass panels need to be cut and singulated. LPKF will deploy its Tensor technology for this step, replacing slower and more expensive legacy processes. This increases their rev potential per facility.
LPKF’s technical position looks strong, but we need to look at the risks. The share price has been in a sharp downtrend since 2021. The root cause is a significant mismatch in timelines. Management communicated the massive potential of the LIDE technology years ago. This triggered a major stock rally. However, the commercial execution and the transition to HVM took much longer than the market anticipated. ➡️ That doesn’t surprise me at all. The market was far too optimistic about the glass timeline and didn’t take the supply chain into account at all. However, given the demands of AI and photonics, glass is now much more likely, and there are now much clearer signs that the major semi companies are incorporating glass into their supply chains. Consequently, the recent LPKF stock rally was simply unfounded and wasn’t confirmed by semi fab experts at that time window. With NVIDIA’s photonics boom, the situation is now significantly different.
This delay caused deep frustration. Many investors (retail and professionals) who bought the vision early are now sitting on heavy losses. Dr. Fiedler openly addressed this critique during the interview. He acknowledged that the market is tired of future promises. The reality of the semi supply chain is complex. LPKF solved the glass via challenge early, but the broader ecosystem was simply not ready to scale the downstream processes.
For the stock to regain investor trust, the narrative must transition from qualification phases to actual purchase orders. Until the first eight figure volume orders hit the books, the market will treat LPKF with extreme caution. The primary risk is just time. If the broader glass substrate adoption faces further delays due to external supply chain bottlenecks, the company will have to sustain its operations without the anticipated rev surge. Investors must weigh the massive value creation against the risk of further timeline shifts.
Samsung Electro Mechanics
Samsung gives immediate exposure to Broadcom and Apple. There is very strong evidence, that Samsung already ships glass substrates samples to Apple.
Source: thelec.kr, released a a few days ago, on April 07, 2026
Korean supply chain reporting repeatedly places LPKF inside the Samsung glass substrate ecosystem. vlmkapital points out that Samsung teamed with Chemtronics and LPKF specifically for Through Glass Vias development. Reports explicitly confirm that the via and plating processes were developed internally using equipment from Applied Materials and LPKF. While Samsung is actively trying to establish secondary suppliers like JWMT, the entire process was designed around LPKF technology. I’m sure LPKF holds a very strong position here.
Source: vlmkapital
Absolics and SKC
The LIDE process is also visible in SKC and Absolics substrate packaging patents. While Korean supplier JWMT exists, timeline analysis shows the Absolics patents predate JWMT entering into this specific technology. This confirms the early and deep involvement of LPKF.
The Co Packaged Optics Challenge
Moving data at Terahertz frequencies requires co packaged optics directly on the glass. LPKF is moving beyond basic structuring into singulation and laser based bonding. vlmkapital highlights a 2026 SPIE paper authored by LPKF and Fraunhofer IZM detailing co packaged optics on glass substrates. This reveals institutional overlap with Schott and Corning, positioning LPKF at the center of the optical interconnect infrastructure.
🚨PUSH IT TO THE LIMIT